#07Power & Distribution Transformer Inspection
Multi-Asset / Multi-Point Equipment Schedule
Inspect multiple transformers, panels, rooms, motors, or RCDs in this module without overwriting previous assets. Each item receives a permanent QR Sticker UID preserved across annual audits.
Sticker UID: OC-TRAN-3A5DStandard Limits, Equations & Space Presets
IEC 60076, IEEE C57.104-2019 Dissolved Gas Analysis (DGA) Condition 1-4 thresholds, NETA ATS Turns Ratio (+/-0.5%), Winding Resistance Imbalance (<=2%), and Oil Breakdown Voltage (ASTM D877).
Measured Inputs
Calculated / Evaluated Results
Acceptance: TTR within +/-0.5% of nameplate (NETA ATS 7.2.2), insulation resistance >= 1 MOhm per kV of rated voltage (IEEE 43 / NETA ATS Table 100.5), top-oil rise within the nameplate class (IEEE C57.12.00) and dissolved gas condition per IEEE C57.104-2019.
Pending / Not tested — results stay neutral until valid measured values are entered.
- Pending
Rated HV Current & Actual Load
-
Three-phase primary nominal current In = kVA / (sqrt(3) x kV) per IEC 60076-1.
- Pending
Loading Level
- %
Not tested - enter the measured value. Acceptance: Continuous loading <= 80% of rating preserves insulation life (IEC 60076-7 / IEEE C57.91 loading guide) [IEEE C57.91 / IEC 60076-7]
- Pending
Top Oil Rise over Ambient
- degC
Not tested - enter the measured value. Acceptance: Rise <= 65 degC per the nameplate temperature rise class [IEEE C57.12.00 / IEC 60076-2]
- Pending
Turns Ratio (TTR) Deviation
- %
Not tested - enter the measured value. Acceptance: Within +/-0.5% of the nameplate ratio on every tap [NETA ATS 7.2.2 / IEEE C57.12.90]
- Pending
Winding Resistance Imbalance
- %
Not tested - enter the measured value. Acceptance: Phase-to-phase deviation <= 1-2% of the average (NETA field criterion) [NETA ATS 7.2.1.2 / IEEE C57.152]
- Pending
Insulation Resistance vs (kV + 1) MOhm Minimum
-
Not tested - enter the measured value. Acceptance: IR_min = (Rated kV + 1) MOhm, corrected to 20 degC [IEEE 43 / IEEE C57.152 / NETA ATS Table 100.5]
- Pending
Oil Dielectric Breakdown
- kV
Not tested - enter the measured value. Acceptance: In-service mineral oil >= 26 kV (ASTM D877, 0.1 in gap) [IEEE C57.106 / ASTM D877]
- Pending
Dissolved Gas Condition (TDCG)
-
Not tested - Condition 1 (<= 720 ppm): normal operation. [IEEE C57.104-2019]
Verification Checklist (0 / 18)
1Nameplate kVA, vector group (e.g. Dyn11), impedance %Uk and tap voltages verified against SLD [IEC 60076-1]
2Main tank, conservator, radiator fins, drain valves and flange gaskets free of oil seepage
3Conservator oil level gauge (MOG) and low-oil alarm contact tested
4Dehydrating silica gel breather active (blue/orange, < 30% saturated) and oil seal cup filled
5Buchholz gas/surge relay float alarm and flap trip contacts proven to trip HV breaker
6Pressure Relief Device (PRD) / sudden pressure relay micro-switch and visual flag verified
7Oil Temperature Indicator (OTI) and Winding Temperature Indicator (WTI) alarm/trip stages calibrated
8Forced cooling fans (ONAF) and oil pumps tested in manual and automatic WTI start modes
9De-energised (DETC) or On-Load Tap Changer (OLTC) operation counter, oil diverter and tap position recorded
10Turns Ratio (TTR) measured on all taps within +/-0.5% of nameplate ratio [NETA ATS 7.2.2]
11Winding DC resistance measured on all phases (imbalance <= 1-2%) and core demagnetised after test
12HV-to-LV, HV-to-E, and LV-to-E Insulation Resistance and Polarization Index (PI) tested [IEEE C57.152]
13HV and LV porcelain/polymer bushings clean, free of cracks, corona tracking, or oil weeping
14Transformer star-point neutral bushing earthing conductor and frame dual-earth bonds verified (<= 0.2 Ohm)
15HV plug-in elbows / cable terminations and LV busbar flags torque-checked and IR thermography scanned
16Insulating oil sample drawn for ASTM D877/D1816 breakdown, moisture (ppm), acidity, and IEEE C57.104 DGA
17Oil containment bund pit (>= 110% oil volume), flame-trap gravel bed, and fire deluge/barriers intact
18Transformer bay interlock keys (Castell/Kirk key scheme between HV CB, LV ACB and door) verified
General Notes
Free plan: 5 of 5 inspections / calculations left this month.